Production Efficiency & OEE

Measure downtime, cycle time and bottlenecks from video.

85.4
Pilot line OEE score
46.8 s
Station active work time
0
New sensors installed on the line

At most plants OEE is a form filled in by hand at the end of a shift. Every hand-filled form is a rounded version of reality.

Computer vision measures whether the machine is running, how long a stoppage lasted and which station is slowing the line — without touching the PLC. When the operator tags the reason with one tap, lost time stops being an estimate and becomes a budgetable line item.

How it works

01 / STATE

Is the machine running?

Motion signature and indicator lamp are evaluated together.

02 / CYCLE

Time measured

Product passes are counted; cycle time and its deviation are computed.

03 / BOTTLENECK

Line balance

Stations are compared and the one slowing the line is flagged.

Lost time shrinks once it has a name

The value of OEE lies in its breakdown, not the score. Seeing that 38% of downtime comes from die changes and 21% from waiting for material makes the destination of the improvement budget indisputable. Because measurement is automatic, comparisons across shifts and lines stay fair.

Downtime reasons · share of total downtime
Die / setup change38%
Waiting for material21%
Breakdown17%
Break handover13%
Quality intervention11%

Halving setup-change time alone contributes roughly 6 points to OEE.

Weekly OEE · +9.3 points
W176
W278
W379
W481
W582
W684
W785
W885

The gain comes not from equipment investment but from planning the downtime that became visible.

Use cases

Metal

Press line

Die change and downtime analysis.

Textile

Sewing line

Cycle time per station.

Food

Packaging

Line speed and bottleneck detection.

Assembly

Manual station

Operator active-time measurement.

Technical requirements

CameraFixed camera with a clear view of machine and station
SensorsNot required; existing PLC data can be merged if available
OutputOEE with availability, performance and quality breakdown
IntegrationMES, ERP/SAP, Power BI, REST API
DashboardShift-board view for floor displays

Frequently asked questions

How does Production Efficiency & OEE work?

At most plants OEE is a form filled in by hand at the end of a shift. Every hand-filled form is a rounded version of reality.

Are our existing cameras suitable for this solution?

Required camera specification: Fixed camera with a clear view of machine and station. Before installation we assess your camera inventory free of charge and report which points are suitable and, if needed, which camera should be added.

What results and indicators does it provide?

Key indicators: Pilot line OEE score: 85.4; Station active work time: 46.8 s; New sensors installed on the line: 0. Halving setup-change time alone contributes roughly 6 points to OEE. Thresholds are calibrated on your own site during the pilot.

Which systems does it integrate with?

MES, ERP/SAP, Power BI, REST API. Events are published over REST API and MQTT, so it connects to your existing MES, ERP, VMS and alarm infrastructure.

Is it compliant with KVKK, Türkiye's data-protection law?

Footage is processed on an edge server inside your facility; raw video is not sent to the cloud. Facial recognition is not used; analytics outputs are anonymous and event clips are deleted automatically when the defined retention period ends.

See this solution on your own site
Let's test it with your existing camera in a 15-minute demo call.
Book a 15-min demo

Other solutions in Production & Operations

ÜRT-02 · Product ID
Product-Based Video Evidence
Match and archive every package’s footage with its product ID.
ÜRT-03 · 5S
Housekeeping & 5S Monitoring
Automate checks for clear walkways, spills and unattended objects.
ÜRT-04 · Custom model
Custom Video Analytics
Models built from scratch for needs that off-the-shelf solutions cannot meet.

Technical articles on this topic (in Turkish)

Kamera ile OEE Ölçümü
MES Entegrasyonu
Üretim Hattının Dijital İkizi